A state of the art industrial paper manufacturing mill in Mehoopany PA. 22 million square foot facility.
- Cogen II- 65 mega watt natural gas cogeneration project. WEI, installed an exterior and interior cable tray which included structural steel and concrete work to support the cable tray installation., a 13.2kV 4,000 AMP feeder from the cogen to the utility substation, High voltage testing and termination for the facility and all fiber optic cabling termination for the project.
- 13.2 KV for Line 5 relocation, of which we relocated the existing overhead high voltage lines, we also installed manholes, & underground conduit to relocate Line 5 for a BP wind energy tie in to the Penelec utility station.
- WEI, also provides electrical and instrumentation work for paper making and converting operations on a day-to-day basis.
- WEI, has been a preferred on-site vendor for P&G for several years. Where safety and quality workmanship continue to prevail.