    Procter & Gamble

    A state of the art industrial paper manufacturing mill in Mehoopany PA. 22 million square foot facility.

    • Cogen II- 65 mega watt natural gas cogeneration project. WEI, installed an exterior and interior cable tray which included structural steel and concrete work to support the cable tray installation., a 13.2kV 4,000 AMP feeder from the cogen to the utility substation, High voltage testing and termination for the facility and all fiber optic cabling termination for the project.
    • 13.2 KV for Line 5 relocation, of which we relocated the existing overhead high voltage lines, we also installed manholes, & underground conduit to relocate Line 5 for a BP wind energy tie in to the Penelec utility station.
    • WEI, also provides electrical and instrumentation work for paper making and converting operations on a day-to-day basis.
    • WEI, has been a preferred on-site vendor for P&G for several years. Where safety and quality workmanship continue to prevail.

    Date

    February 2016

    Client

    Procter & Gamble

    Categories

    • Industrial Manufacturing
    Share
    • Facebook
    • Twitter
    • Google Plus
    • Linkedin
    Wilkes Gateway
    Williams Compressor Station’s in the Northeast
      Copyright © Walsh Electrical All Rights Reserved
      Website by: Design Done Right
      ↑